Triple

T18934817
Position Surface form Disambiguated ID Type / Status
Subject Piva River E463214 entity
Predicate hasDam P8736 FINISHED
Object Mratinje Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mratinje Dam | Statement: [Piva River, hasDam, Mratinje Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mratinje Dam
Context triple: [Piva River, hasDam, Mratinje Dam]
  • A. Salakovac Dam
    Salakovac Dam is a hydroelectric dam and power plant on the Neretva River in Bosnia and Herzegovina, used primarily for electricity generation and water management.
  • B. Grabovica Dam
    Grabovica Dam is a hydroelectric dam on the Neretva River in Bosnia and Herzegovina, forming part of the river’s major power-generation system.
  • C. Jablanica Dam
    Jablanica Dam is a large hydroelectric dam on the Neretva River in Bosnia and Herzegovina, forming Jablanica Lake and serving as a key source of regional power generation.
  • D. Globocica Dam
    Globocica Dam is a hydroelectric dam on the Black Drin River in North Macedonia, forming the Globocica Reservoir and contributing to the country’s power generation and water management.
  • E. Orava Dam
    Orava Dam is a major hydroelectric and flood-control structure in northern Slovakia that impounds the Orava River to form one of the country’s largest artificial lakes.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Mratinje Dam
Target entity description: Mratinje Dam is a large concrete arch dam in Montenegro, known for creating the Piva Lake reservoir and housing one of the country’s major hydroelectric power plants.
  • A. Salakovac Dam
    Salakovac Dam is a hydroelectric dam and power plant on the Neretva River in Bosnia and Herzegovina, used primarily for electricity generation and water management.
  • B. Grabovica Dam
    Grabovica Dam is a hydroelectric dam on the Neretva River in Bosnia and Herzegovina, forming part of the river’s major power-generation system.
  • C. Jablanica Dam
    Jablanica Dam is a large hydroelectric dam on the Neretva River in Bosnia and Herzegovina, forming Jablanica Lake and serving as a key source of regional power generation.
  • D. Globocica Dam
    Globocica Dam is a hydroelectric dam on the Black Drin River in North Macedonia, forming the Globocica Reservoir and contributing to the country’s power generation and water management.
  • E. Orava Dam
    Orava Dam is a major hydroelectric and flood-control structure in northern Slovakia that impounds the Orava River to form one of the country’s largest artificial lakes.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfec90481909e926be9767e5779 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5d3e6a8208190973669cae439a91e completed April 20, 2026, 7:21 a.m.
Created at: April 10, 2026, 11:59 a.m.