Triple
T18909202
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Czech motorway network |
E462551
|
entity |
| Predicate | hasComponent |
P35
|
FINISHED |
| Object | D11 motorway (Czech Republic) |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: D11 motorway (Czech Republic) | Statement: [Czech motorway network, hasComponent, D11 motorway (Czech Republic)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: D11 motorway (Czech Republic) Context triple: [Czech motorway network, hasComponent, D11 motorway (Czech Republic)]
-
A.
D1 motorway (Czech Republic)
The D1 motorway is the Czech Republic’s oldest and most important highway, linking Prague with Brno and forming a key east–west transport corridor.
-
B.
D4 motorway (Czech Republic)
The D4 motorway is a major Czech highway that connects Prague with the southern regions of the country, serving as an important route toward Příbram and Strakonice.
-
C.
D6 motorway (Czech Republic)
The D6 motorway is a major Czech highway connecting Prague with the western regions of the country, including Karlovy Vary and the border area near Germany.
-
D.
D52 motorway (Czech Republic)
The D52 motorway is a major Czech highway connecting Brno toward the Austrian border, forming part of an important north–south transport corridor in Central Europe.
-
E.
Czech motorway network
The Czech motorway network is the nationwide system of high-capacity, high-speed roads that connects major cities and regions across the Czech Republic and links the country to neighboring states.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: D11 motorway (Czech Republic) Target entity description: The D11 motorway is a major Czech highway connecting Prague with the northeastern regions toward Hradec Králové and the Polish border, forming part of an important international transport corridor.
-
A.
D1 motorway (Czech Republic)
The D1 motorway is the Czech Republic’s oldest and most important highway, linking Prague with Brno and forming a key east–west transport corridor.
-
B.
D4 motorway (Czech Republic)
The D4 motorway is a major Czech highway that connects Prague with the southern regions of the country, serving as an important route toward Příbram and Strakonice.
-
C.
D6 motorway (Czech Republic)
The D6 motorway is a major Czech highway connecting Prague with the western regions of the country, including Karlovy Vary and the border area near Germany.
-
D.
D52 motorway (Czech Republic)
The D52 motorway is a major Czech highway connecting Brno toward the Austrian border, forming part of an important north–south transport corridor in Central Europe.
-
E.
Czech motorway network
The Czech motorway network is the nationwide system of high-capacity, high-speed roads that connects major cities and regions across the Czech Republic and links the country to neighboring states.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfd05bc819088903cca13cc2846 |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5c62182f48190ad81b6ef0c7bc7da |
completed | April 20, 2026, 6:22 a.m. |
Created at: April 10, 2026, 11:58 a.m.