Triple
T18909196
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Czech motorway network |
E462551
|
entity |
| Predicate | hasComponent |
P35
|
FINISHED |
| Object | D4 motorway (Czech Republic) |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: D4 motorway (Czech Republic) | Statement: [Czech motorway network, hasComponent, D4 motorway (Czech Republic)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: D4 motorway (Czech Republic) Context triple: [Czech motorway network, hasComponent, D4 motorway (Czech Republic)]
-
A.
D5 motorway
The D5 motorway is a major Czech highway connecting Prague with the German border near Rozvadov, forming part of the European route E50 and a key transport corridor through the Plzeň Region.
-
B.
Czech motorway network
The Czech motorway network is the nationwide system of high-capacity, high-speed roads that connects major cities and regions across the Czech Republic and links the country to neighboring states.
-
C.
D2 motorway
The D2 motorway is a major Slovak highway forming part of the European route network, connecting Bratislava with the Czech Republic and Hungary and serving as a key north–south transport corridor.
-
D.
D3 motorway
The D3 motorway is a major Czech highway forming part of the route between Prague and the Austrian border, improving north–south transport through the South Bohemian region.
-
E.
D1 motorway
The D1 motorway is a major Slovak highway forming part of the country’s primary east–west transport corridor, connecting key cities including Bratislava and Košice.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: D4 motorway (Czech Republic) Target entity description: The D4 motorway is a major Czech highway that connects Prague with the southern regions of the country, serving as an important route toward Příbram and Strakonice.
-
A.
D5 motorway
The D5 motorway is a major Czech highway connecting Prague with the German border near Rozvadov, forming part of the European route E50 and a key transport corridor through the Plzeň Region.
-
B.
Czech motorway network
The Czech motorway network is the nationwide system of high-capacity, high-speed roads that connects major cities and regions across the Czech Republic and links the country to neighboring states.
-
C.
D2 motorway
The D2 motorway is a major Slovak highway forming part of the European route network, connecting Bratislava with the Czech Republic and Hungary and serving as a key north–south transport corridor.
-
D.
D3 motorway
The D3 motorway is a major Czech highway forming part of the route between Prague and the Austrian border, improving north–south transport through the South Bohemian region.
-
E.
D1 motorway
The D1 motorway is a major Slovak highway forming part of the country’s primary east–west transport corridor, connecting key cities including Bratislava and Košice.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfd05bc819088903cca13cc2846 |
completed | April 10, 2026, 11:20 a.m. |
| NER | Named-entity recognition | batch_69e5c62182f48190ad81b6ef0c7bc7da |
completed | April 20, 2026, 6:22 a.m. |
Created at: April 10, 2026, 11:58 a.m.