Triple
T18891702
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | F Canyon |
E462105
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | reprocessing plant |
C16067
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: reprocessing plant Context triple: [F Canyon, instanceOf, reprocessing plant]
-
A.
uranium processing facility
A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
-
B.
industrial plant
An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
-
C.
radioactive waste processing facility
chosen
A radioactive waste processing facility is a specialized industrial installation that receives, treats, conditions, and packages radioactive materials to reduce their hazard and prepare them for safe transport, storage, or disposal in compliance with strict regulatory and environmental standards.
-
D.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
-
E.
oil processing facility
An oil processing facility is an industrial complex where crude oil is received, separated, treated, and refined into usable products such as fuels, lubricants, and feedstocks under controlled conditions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8dcfc3430819095ee6fc0eb4c06a5 |
completed | April 10, 2026, 11:20 a.m. |
Created at: April 10, 2026, 11:58 a.m.