Triple

T18873877
Position Surface form Disambiguated ID Type / Status
Subject AGC E461634 entity
Predicate instanceOf P0 FINISHED
Object railway agreement C16214 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway agreement
Context triple: [AGC, instanceOf, railway agreement]
  • A. transport infrastructure agreement chosen
    A transport infrastructure agreement is a formal contract between parties that defines the responsibilities, funding, timelines, and performance standards for planning, building, operating, or maintaining transportation facilities such as roads, railways, ports, or airports.
  • B. joint railway
    A joint railway is a rail line or network that is owned, operated, or managed collaboratively by two or more railway companies or authorities, sharing infrastructure, services, and responsibilities.
  • C. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • D. rail
    A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
  • E. rail
    A rail is a long, continuous bar or track that provides guidance, support, or a running surface for vehicles, objects, or people in transportation or structural systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfb7b9c8190854e7b171b98ea2e completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 11:57 a.m.