Triple

T18844556
Position Surface form Disambiguated ID Type / Status
Subject Atal Mission for Rejuvenation and Urban Transformation E460883 entity
Predicate instanceOf P0 FINISHED
Object urban infrastructure development program C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban infrastructure development program
Context triple: [Atal Mission for Rejuvenation and Urban Transformation, instanceOf, urban infrastructure development program]
  • A. urban development
    Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
  • B. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • C. urban design project
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • D. urban planning structure
    An urban planning structure is a designed physical or organizational element within a city—such as streets, parks, zoning frameworks, or transit systems—that shapes how urban space is organized, used, and experienced.
  • E. urban planning milestone
    An urban planning milestone is a significant event, decision, or achievement that marks measurable progress in the development, implementation, or transformation of a city’s spatial, social, or infrastructural plans.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcfa11e4819090ab1ef5bdcd2b2e completed April 10, 2026, 11:20 a.m.
Created at: April 10, 2026, 11:56 a.m.