Triple

T18831548
Position Surface form Disambiguated ID Type / Status
Subject Mississippi Highway 603 E460541 entity
Predicate partOf P40 FINISHED
Object Mississippi State Highway System NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mississippi State Highway System | Statement: [Mississippi Highway 603, partOf, Mississippi State Highway System]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mississippi State Highway System
Context triple: [Mississippi Highway 603, partOf, Mississippi State Highway System]
  • A. Mississippi Highway 4
    Mississippi Highway 4 is an east–west state highway in northern Mississippi that connects several small towns and rural communities, including Holly Springs.
  • B. Mississippi Highway 7
    Mississippi Highway 7 is a state highway in northern Mississippi that runs generally north–south, connecting several small towns and rural communities to larger regional routes.
  • C. Mississippi Highway 503
    Mississippi Highway 503 is a state highway in Mississippi that serves as a regional connector route in the east-central part of the state, including access to the town of Decatur.
  • D. Mississippi Highway 35
    Mississippi Highway 35 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities and regional centers.
  • E. Mississippi Highway 39
    Mississippi Highway 39 is a state highway in eastern Mississippi that runs north–south through several counties, connecting rural communities to larger regional routes and towns.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Mississippi State Highway System
Target entity description: The Mississippi State Highway System is the network of state-maintained roads and highways that facilitates regional and statewide transportation across Mississippi.
  • A. Mississippi Highway 4
    Mississippi Highway 4 is an east–west state highway in northern Mississippi that connects several small towns and rural communities, including Holly Springs.
  • B. Mississippi Highway 7
    Mississippi Highway 7 is a state highway in northern Mississippi that runs generally north–south, connecting several small towns and rural communities to larger regional routes.
  • C. Mississippi Highway 503
    Mississippi Highway 503 is a state highway in Mississippi that serves as a regional connector route in the east-central part of the state, including access to the town of Decatur.
  • D. Mississippi Highway 35
    Mississippi Highway 35 is a state highway in Mississippi that runs north–south across multiple counties, connecting rural communities and regional centers.
  • E. Mississippi Highway 39
    Mississippi Highway 39 is a state highway in eastern Mississippi that runs north–south through several counties, connecting rural communities to larger regional routes and towns.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcf94c288190a06dea029ae4b223 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5a9992bb081908ba517a5c9d93ef3 completed April 20, 2026, 4:20 a.m.
Created at: April 10, 2026, 11:56 a.m.