Triple

T18822932
Position Surface form Disambiguated ID Type / Status
Subject Expo 2030 E460308 entity
Predicate closingMonth P70538 FINISHED
Object March 2031 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: March 2031 | Statement: [Expo 2030, closingMonth, March 2031]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: closingMonth
Context triple: [Expo 2030, closingMonth, March 2031]
  • A. closureYear
    Indicates the year in which an entity (such as an organization, facility, or service) ceased operations or was officially closed.
  • B. closingMovement
    Indicates a movement in which one entity reduces distance or space relative to another, bringing them closer together.
  • C. monthOfEnd chosen
    Indicates the calendar month in which an event, period, or interval ends.
  • D. closingPosition
    Indicates that an entity terminates, finalizes, or brings to an end the position or state of another entity.
  • E. closingTime
    Indicates the specific time at which a place, service, or activity stops operating or becomes unavailable.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8dcf94c288190a06dea029ae4b223 completed April 10, 2026, 11:20 a.m.
NER Named-entity recognition batch_69e5a6bbc7148190819252071a765975 completed April 20, 2026, 4:08 a.m.
PD Predicate disambiguation batch_69e48d1b10ec8190985c6fb5766ff981 completed April 19, 2026, 8:06 a.m.
Created at: April 10, 2026, 11:55 a.m.