Triple

T18796880
Position Surface form Disambiguated ID Type / Status
Subject Sweden–Norway rail link E459657 entity
Predicate hasSection P35 FINISHED
Object Ofoten Line NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ofoten Line | Statement: [Sweden–Norway rail link, hasSection, Ofoten Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ofoten Line
Context triple: [Sweden–Norway rail link, hasSection, Ofoten Line]
  • A. Ofoten Line chosen
    The Ofoten Line is a Norwegian railway line in northern Scandinavia primarily used to transport iron ore from Sweden to the ice-free port of Narvik on the Ofotfjord.
  • B. Setesdal Line
    The Setesdal Line is a historic narrow-gauge railway in southern Norway, now preserved as a heritage railway and tourist attraction.
  • C. Randsfjord Line
    The Randsfjord Line is a historic Norwegian railway line connecting Drammen to Hønefoss, once an important route for both passenger and freight traffic in southeastern Norway.
  • D. Dovre Line
    The Dovre Line is a major Norwegian railway route that connects Oslo with Trondheim, running through the scenic Gudbrandsdalen valley and over the Dovrefjell mountain plateau.
  • E. Vestfold Line
    The Vestfold Line is a key railway route in southeastern Norway that connects Oslo with towns along the western shore of the Oslofjord, serving as an important corridor for both passenger and regional traffic.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d398c7d4819091cb2f7e48948aeb completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5a020821881909749f6a1c6cd195b completed April 20, 2026, 3:40 a.m.
Created at: April 10, 2026, 11:53 a.m.