Triple

T18796879
Position Surface form Disambiguated ID Type / Status
Subject Sweden–Norway rail link E459657 entity
Predicate hasSection P35 FINISHED
Object Värmlandsbanan NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Värmlandsbanan | Statement: [Sweden–Norway rail link, hasSection, Värmlandsbanan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Värmlandsbanan
Context triple: [Sweden–Norway rail link, hasSection, Värmlandsbanan]
  • A. Värmland Line chosen
    The Värmland Line is a railway route in western Sweden that connects key towns in Värmland County with the broader national and international rail network.
  • B. Södermanland railway line
    The Södermanland railway line is a Swedish rail route in the province of Södermanland that connects several towns and cities west of Stockholm, serving both regional passenger and freight traffic.
  • C. Stångådalsbanan
    Stångådalsbanan is a regional railway line in southeastern Sweden that connects Linköping with coastal towns such as Västervik.
  • D. Västkustbanan
    Västkustbanan is a major Swedish railway line running along the country’s west coast, connecting key cities such as Gothenburg and Malmö.
  • E. Södertälje line
    The Södertälje line is a Swedish railway route in the Stockholm area that connects several southern suburbs and towns, including Tumba, with Södertälje and the broader regional rail network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d398c7d4819091cb2f7e48948aeb completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5a020821881909749f6a1c6cd195b completed April 20, 2026, 3:40 a.m.
Created at: April 10, 2026, 11:53 a.m.