Triple
T1879637
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cruquius Pumping Station |
E39822
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | steam pumping station |
C7851
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: steam pumping station Context triple: [Cruquius Pumping Station, instanceOf, steam pumping station]
-
A.
water-powered mill
A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
-
B.
steam-powered railway
A steam-powered railway is a transportation system in which trains are propelled along tracks by locomotives that generate mechanical power from steam produced by boiling water, typically using coal or other fuels.
-
C.
steam-generating boiler
A steam-generating boiler is an enclosed vessel in which water is heated—typically by burning fuel or using other heat sources—to produce pressurized steam for power generation, heating, or industrial processes.
-
D.
train station
A train station is a designated facility where trains regularly stop to pick up and drop off passengers and sometimes freight, typically featuring platforms, ticketing services, and waiting areas.
-
E.
commuter rail station
A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88633e4fc8190b7eb40463e048ec5 |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:34 p.m.