Triple

T18783048
Position Surface form Disambiguated ID Type / Status
Subject Jim Collins E459306 entity
Predicate coAuthorOf P2389 FINISHED
Object Built to Last NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Built to Last | Statement: [Jim Collins, coAuthorOf, Built to Last]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Built to Last
Context triple: [Jim Collins, coAuthorOf, Built to Last]
  • A. Built to Last
    Built to Last is the final studio album by the American rock band Grateful Dead, released in 1989 and noted for its polished production and later-era songwriting.
  • B. Built to Last
    "Built to Last" is a television sitcom in which actor Geoffrey Owens played a prominent role.
  • C. Built to Last chosen
    Built to Last is a bestselling business book that analyzes the habits and strategies of visionary companies to explain what makes them enduringly successful.
  • D. Built to Last (song)
    "Built to Last" is a song best known as a 1989 single by the Grateful Dead, featured on their album of the same name.
  • E. In Search of Excellence
    In Search of Excellence is the guiding motto of COMSATS University Islamabad, reflecting its commitment to high academic and research standards.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d396f54c8190ba49db31e8743842 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5977f34e48190a9932af330ea4f92 completed April 20, 2026, 3:03 a.m.
Created at: April 10, 2026, 11:52 a.m.