Triple
T18767207
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | San Roque Dam |
E458922
|
entity |
| Predicate | operator |
P179
|
FINISHED |
| Object | San Roque Power Corporation |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: San Roque Power Corporation | Statement: [San Roque Dam, operator, San Roque Power Corporation]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: San Roque Power Corporation Context triple: [San Roque Dam, operator, San Roque Power Corporation]
-
A.
Public Power Corporation S.A.
Public Power Corporation S.A. is Greece’s largest electric power company, responsible for electricity generation, distribution, and supply across the country.
-
B.
National Power Corporation
The National Power Corporation is a Philippine government-owned corporation responsible for power generation and electrification, particularly in missionary and off-grid areas.
-
C.
Puerto Rico Electric Power Authority
The Puerto Rico Electric Power Authority is the public corporation responsible for generating, transmitting, and distributing electricity across Puerto Rico.
-
D.
Guam Power Authority
Guam Power Authority is the government-owned electric utility responsible for generating, transmitting, and distributing electricity throughout Guam.
-
E.
Great Western Power Company
Great Western Power Company was an early 20th-century California electric utility company known for developing hydroelectric projects and infrastructure in the Sierra Nevada region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: San Roque Power Corporation Target entity description: San Roque Power Corporation is the private company that manages and operates the large San Roque hydroelectric power facility in the Philippines.
-
A.
Public Power Corporation S.A.
Public Power Corporation S.A. is Greece’s largest electric power company, responsible for electricity generation, distribution, and supply across the country.
-
B.
National Power Corporation
The National Power Corporation is a Philippine government-owned corporation responsible for power generation and electrification, particularly in missionary and off-grid areas.
-
C.
Puerto Rico Electric Power Authority
The Puerto Rico Electric Power Authority is the public corporation responsible for generating, transmitting, and distributing electricity across Puerto Rico.
-
D.
Guam Power Authority
Guam Power Authority is the government-owned electric utility responsible for generating, transmitting, and distributing electricity throughout Guam.
-
E.
Great Western Power Company
Great Western Power Company was an early 20th-century California electric utility company known for developing hydroelectric projects and infrastructure in the Sierra Nevada region.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d395dba0819087568404508590cb |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e58d859c8081909cec3aa64d264885 |
completed | April 20, 2026, 2:20 a.m. |
Created at: April 10, 2026, 11:52 a.m.