Triple

T18767187
Position Surface form Disambiguated ID Type / Status
Subject Binga Dam E458921 entity
Predicate hasPowerStation P17850 FINISHED
Object Binga Hydroelectric Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Binga Hydroelectric Power Plant | Statement: [Binga Dam, hasPowerStation, Binga Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Binga Hydroelectric Power Plant
Context triple: [Binga Dam, hasPowerStation, Binga Hydroelectric Power Plant]
  • A. Bujagali Hydropower Station
    Bujagali Hydropower Station is a major hydroelectric power plant in Uganda that generates electricity from the Victoria Nile to supply a significant portion of the country’s power needs.
  • B. Wyangala hydroelectric power station
    Wyangala hydroelectric power station is a small hydroelectric facility in New South Wales, Australia, that generates renewable electricity using water released from Wyangala Dam.
  • C. Nyabarongo I Hydropower Plant
    Nyabarongo I Hydropower Plant is a major hydroelectric power station in Rwanda that harnesses the Nyabarongo River to generate electricity for the national grid.
  • D. Nalubaale Power Station
    Nalubaale Power Station is a major hydroelectric power plant in Uganda, located at the outlet of Lake Victoria on the Victoria Nile near Jinja.
  • E. Roseires Hydropower Plant
    Roseires Hydropower Plant is a major hydroelectric facility in Sudan that generates electricity using water impounded by the Roseires Dam on the Blue Nile River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Binga Hydroelectric Power Plant
Target entity description: Binga Hydroelectric Power Plant is a major hydroelectric facility in the Philippines that generates electricity using water impounded by the Binga Dam on the Agno River.
  • A. Bujagali Hydropower Station
    Bujagali Hydropower Station is a major hydroelectric power plant in Uganda that generates electricity from the Victoria Nile to supply a significant portion of the country’s power needs.
  • B. Wyangala hydroelectric power station
    Wyangala hydroelectric power station is a small hydroelectric facility in New South Wales, Australia, that generates renewable electricity using water released from Wyangala Dam.
  • C. Nyabarongo I Hydropower Plant
    Nyabarongo I Hydropower Plant is a major hydroelectric power station in Rwanda that harnesses the Nyabarongo River to generate electricity for the national grid.
  • D. Nalubaale Power Station
    Nalubaale Power Station is a major hydroelectric power plant in Uganda, located at the outlet of Lake Victoria on the Victoria Nile near Jinja.
  • E. Roseires Hydropower Plant
    Roseires Hydropower Plant is a major hydroelectric facility in Sudan that generates electricity using water impounded by the Roseires Dam on the Blue Nile River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d395dba0819087568404508590cb completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e58d859c8081909cec3aa64d264885 completed April 20, 2026, 2:20 a.m.
Created at: April 10, 2026, 11:52 a.m.