Triple

T18748030
Position Surface form Disambiguated ID Type / Status
Subject National Academy of Indian Railways E458453 entity
Predicate instanceOf P0 FINISHED
Object railway training institute C41570 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway training institute
Context triple: [National Academy of Indian Railways, instanceOf, railway training institute]
  • A. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • B. Indian Railways recruitment examination
    The Indian Railways recruitment examination is a competitive, nationwide test conducted by Indian Railways and the Railway Recruitment Boards to select eligible candidates for various technical, non-technical, and security-related posts across the railway network.
  • C. rail
    A rail is a long, continuous bar or track that provides guidance, support, or a running surface for vehicles, objects, or people in transportation or structural systems.
  • D. rail
    A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
  • E. railway portal
    A railway portal is a structural entrance or gateway, typically at the mouth of a tunnel or major rail facility, that marks the transition between open track and enclosed or specialized railway infrastructure.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d394dc308190b6725073f5db324c completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:51 a.m.