Triple

T18747423
Position Surface form Disambiguated ID Type / Status
Subject Mumbai Central railway division E458438 entity
Predicate hasImportantRoute P13417 FINISHED
Object Mumbai Central–Ahmedabad route NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mumbai Central–Ahmedabad route | Statement: [Mumbai Central railway division, hasImportantRoute, Mumbai Central–Ahmedabad route]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mumbai Central–Ahmedabad route
Context triple: [Mumbai Central railway division, hasImportantRoute, Mumbai Central–Ahmedabad route]
  • A. Mumbai–Ahmedabad route chosen
    The Mumbai–Ahmedabad route is a major rail and transport corridor in western India connecting the metropolitan cities of Mumbai and Ahmedabad.
  • B. Chennai–Mumbai route
    The Chennai–Mumbai route is a major Indian railway corridor connecting the southeastern metropolis of Chennai with the western financial hub of Mumbai, passing through key junctions across multiple states.
  • C. Mumbai–Pune route
    The Mumbai–Pune route is a major transport corridor in western India connecting the cities of Mumbai and Pune, known for passing through the scenic hill station region of Lonavala.
  • D. Ahmedabad–Vadodara line
    The Ahmedabad–Vadodara line is a key railway corridor in the Indian state of Gujarat that connects the major cities of Ahmedabad and Vadodara and forms part of the busy Western Railway network.
  • E. Ahmedabad–Rajkot line
    The Ahmedabad–Rajkot line is a key railway route in the Indian state of Gujarat that connects the major cities of Ahmedabad and Rajkot, facilitating both passenger and freight transport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasImportantRoute
Context triple: [Mumbai Central railway division, hasImportantRoute, Mumbai Central–Ahmedabad route]
  • A. hasNotableRoute chosen
    Indicates that an entity (such as a transportation service or pathway) includes or is associated with a route that is considered significant, well-known, or otherwise noteworthy.
  • B. hasMajorRouteType
    Indicates that an entity is associated with a primary classification of transportation route (such as highway, rail line, or other major route type).
  • C. hasPrimaryRoute
    Indicates that one entity is designated as the main or principal route associated with another entity.
  • D. isMajorRouteFor
    Indicates that something serves as a primary or heavily used pathway or channel for the movement or flow of something else.
  • E. isMajorRouteInSystem
    Indicates that a route functions as a primary or significant corridor within a specified transportation or network system.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d394dc308190b6725073f5db324c completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e576936cf08190b3c0d2f4e8a616fc completed April 20, 2026, 12:42 a.m.
PD Predicate disambiguation batch_69e48d03766c8190a43f7681842f4f8d completed April 19, 2026, 8:06 a.m.
Created at: April 10, 2026, 11:51 a.m.