Triple
T18744350
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New Victory Theater restoration, New York |
E458368
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | theater restoration project |
C5246
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: theater restoration project Context triple: [New Victory Theater restoration, New York, instanceOf, theater restoration project]
-
A.
church restoration project
A church restoration project is an organized effort to repair, preserve, and sometimes modernize a church building while respecting and maintaining its historical, architectural, and spiritual significance.
-
B.
architectural reconstruction project
An architectural reconstruction project is a coordinated effort to research, design, and rebuild a damaged or lost structure to restore its historical, functional, or aesthetic integrity.
-
C.
theatre initiative
A theatre initiative is an organized effort or program designed to develop, promote, or support theatrical arts, productions, and community engagement in performance.
-
D.
architectural renovation project
chosen
An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
-
E.
White House restoration
White House restoration is the comprehensive process of preserving, repairing, and updating the White House’s historic structure, interiors, and systems while maintaining its architectural integrity and symbolic significance.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d394dc308190b6725073f5db324c |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:51 a.m.