Triple

T18744350
Position Surface form Disambiguated ID Type / Status
Subject New Victory Theater restoration, New York E458368 entity
Predicate instanceOf P0 FINISHED
Object theater restoration project C5246 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: theater restoration project
Context triple: [New Victory Theater restoration, New York, instanceOf, theater restoration project]
  • A. church restoration project
    A church restoration project is an organized effort to repair, preserve, and sometimes modernize a church building while respecting and maintaining its historical, architectural, and spiritual significance.
  • B. architectural reconstruction project
    An architectural reconstruction project is a coordinated effort to research, design, and rebuild a damaged or lost structure to restore its historical, functional, or aesthetic integrity.
  • C. theatre initiative
    A theatre initiative is an organized effort or program designed to develop, promote, or support theatrical arts, productions, and community engagement in performance.
  • D. architectural renovation project chosen
    An architectural renovation project is a coordinated effort to redesign, upgrade, and adapt an existing building or space to meet new functional, aesthetic, regulatory, and sustainability requirements while preserving or enhancing its structural integrity and character.
  • E. White House restoration
    White House restoration is the comprehensive process of preserving, repairing, and updating the White House’s historic structure, interiors, and systems while maintaining its architectural integrity and symbolic significance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d394dc308190b6725073f5db324c completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:51 a.m.