Triple

T18726525
Position Surface form Disambiguated ID Type / Status
Subject Khuzdar E457913 entity
Predicate transportInfrastructure P1777 FINISHED
Object N-25 RCD Highway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: N-25 RCD Highway | Statement: [Khuzdar, transportInfrastructure, N-25 RCD Highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: N-25 RCD Highway
Context triple: [Khuzdar, transportInfrastructure, N-25 RCD Highway]
  • A. N-25 RCD Highway chosen
    N-25 RCD Highway is a major national roadway in Pakistan that serves as a key transportation corridor through the Hub District and connects it to other important regions.
  • B. N25 road
    The N25 road is a major national primary route in Ireland that runs along the south coast, linking Cork with Waterford and other key towns.
  • C. N255 road
    The N255 road is a regional road in Ireland that connects local areas and links with the N57 national route.
  • D. R21 highway
    The R21 highway is a major South African route linking Pretoria with OR Tambo International Airport and Johannesburg’s eastern suburbs, serving as a key commuter and logistics corridor in Gauteng.
  • E. RS-287 highway
    RS-287 highway is a major state road in Rio Grande do Sul, Brazil, that serves as an important transportation corridor linking cities such as Santa Cruz do Sul to other regional centers.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d393ba9c8190a8b03b04ddbb0a09 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e56d73f68c81908a9ddf2cc2fb9813 completed April 20, 2026, 12:04 a.m.
Created at: April 10, 2026, 11:50 a.m.