Triple

T18683348
Position Surface form Disambiguated ID Type / Status
Subject Barnwell Nuclear Fuel Plant site E456789 entity
Predicate instanceOf P0 FINISHED
Object nuclear facility site C16043 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear facility site
Context triple: [Barnwell Nuclear Fuel Plant site, instanceOf, nuclear facility site]
  • A. nuclear power facility
    A nuclear power facility is an industrial complex that generates electricity by harnessing heat produced from controlled nuclear fission reactions within reactors, converting it into mechanical and then electrical energy.
  • B. nuclear weapons production facility
    A nuclear weapons production facility is a highly secured industrial complex where fissile materials are processed and assembled into components and complete systems for nuclear armaments.
  • C. uranium processing facility chosen
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • D. uranium enrichment facility
    A uranium enrichment facility is an industrial complex that increases the concentration of the fissile isotope U-235 in uranium to produce fuel for nuclear reactors or material for nuclear weapons.
  • E. radioactive waste processing facility
    A radioactive waste processing facility is a specialized industrial installation that receives, treats, conditions, and packages radioactive materials to reduce their hazard and prepare them for safe transport, storage, or disposal in compliance with strict regulatory and environmental standards.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d391eb488190ac2e9abf5bf255e4 completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:49 a.m.