Triple
T18679374
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Last Judgment fresco on west façade |
E456691
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | exterior wall painting |
C19003
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: exterior wall painting Context triple: [Last Judgment fresco on west façade, instanceOf, exterior wall painting]
-
A.
panel painting
A panel painting is an artwork created by applying paint onto a rigid, typically wooden, flat support rather than canvas or wall.
-
B.
large-scale painting
A large-scale painting is an expansive artwork that occupies a significant physical area, often enveloping the viewer’s field of vision and transforming the surrounding space into part of the visual experience.
-
C.
public mural
chosen
A public mural is a large-scale artwork created directly on exterior walls or surfaces in shared urban or community spaces, intended for public viewing and cultural or aesthetic enrichment.
-
D.
combine painting
A combine painting is a conceptual class representing artworks that merge traditional painting with three-dimensional objects or mixed media elements into a single integrated composition.
-
E.
cityscape painting
A cityscape painting is an artistic depiction of an urban environment, focusing on buildings, streets, and city life to capture the atmosphere and character of a city.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d391eb488190ac2e9abf5bf255e4 |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:48 a.m.