Triple

T18674733
Position Surface form Disambiguated ID Type / Status
Subject Clear Lake City, Texas E456569 entity
Predicate transportServedBy P1298 FINISHED
Object NASA Road 1 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NASA Road 1 | Statement: [Clear Lake City, Texas, transportServedBy, NASA Road 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NASA Road 1
Context triple: [Clear Lake City, Texas, transportServedBy, NASA Road 1]
  • A. NASA Road 1 chosen
    NASA Road 1 is a major thoroughfare in the Houston area that provides primary access to NASA’s Johnson Space Center and the surrounding Clear Lake community.
  • B. Rocket to the Moon
    "Rocket to the Moon" is a 1938 stage play by American dramatist Clifford Odets that explores themes of love, frustration, and disillusionment in Depression-era New York.
  • C. Le Shuttle
    Le Shuttle is a vehicle-carrying rail service that transports cars, trucks, and passengers through the Channel Tunnel between the United Kingdom and France.
  • D. Mission: SPACE
    Mission: SPACE is a spaceflight-simulation attraction at EPCOT that immerses guests in a realistic, high-intensity mission to Mars experience.
  • E. The Mars Project
    The Mars Project is a seminal 1952 book by rocket engineer Wernher von Braun that outlines one of the earliest detailed technical plans for a human expedition to Mars.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38f72b4819090a935175d9ca8af completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e556b4e390819091ad9dd118ca1f4f completed April 19, 2026, 10:27 p.m.
Created at: April 10, 2026, 11:48 a.m.