Triple
T18666397
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | American Commerce Center |
E456336
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cancelled building project |
C31067
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cancelled building project Context triple: [American Commerce Center, instanceOf, cancelled building project]
-
A.
unfinished tower
An unfinished tower is a partially constructed vertical structure whose incomplete state reveals its intended height or form while remaining functionally or aesthetically unresolved.
-
B.
cancelled launch vehicle
A cancelled launch vehicle is a rocket or spacecraft design whose development or deployment was terminated before it could enter regular operational service.
-
C.
unbuilt building
chosen
An unbuilt building is a fully conceived architectural design that exists only in plans, models, or visualizations and has not yet been constructed in physical form.
-
D.
proposed dam project
A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
-
E.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38f72b4819090a935175d9ca8af |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:48 a.m.