Triple
T18664444
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bedford Basin |
E456290
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | harbour basin |
C453
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: harbour basin Context triple: [Bedford Basin, instanceOf, harbour basin]
-
A.
coastal harbour
A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
-
B.
harbour crossing
A harbour crossing is a transportation route or structure, such as a bridge, tunnel, or ferry service, that enables people and vehicles to travel across a harbour.
-
C.
harbor
chosen
A harbor is a sheltered body of water, often equipped with docks and facilities, where ships can anchor safely for loading, unloading, and protection from rough seas.
-
D.
harbour expansion
Harbour expansion is the planned enlargement and enhancement of a port’s physical infrastructure and operational capacity to accommodate increased maritime traffic, larger vessels, and associated economic activities.
-
E.
bay or inlet
A bay or inlet is a recessed coastal body of water partially enclosed by land, typically with a wider opening to the sea than a harbor but more sheltered than the open ocean.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38f72b4819090a935175d9ca8af |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:48 a.m.