Triple

T18656909
Position Surface form Disambiguated ID Type / Status
Subject Maria Cristina Falls E456090 entity
Predicate powerPlant P17850 FINISHED
Object Agus VI Hydroelectric Power Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Agus VI Hydroelectric Power Plant | Statement: [Maria Cristina Falls, powerPlant, Agus VI Hydroelectric Power Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Agus VI Hydroelectric Power Plant
Context triple: [Maria Cristina Falls, powerPlant, Agus VI Hydroelectric Power Plant]
  • A. Tri An Hydropower Plant
    Tri An Hydropower Plant is a major hydroelectric power station in southern Vietnam that generates electricity from the Dong Nai River and supports regional power supply and water management.
  • B. Porce I Hydroelectric Power Plant
    Porce I Hydroelectric Power Plant is a major hydroelectric facility in Colombia that harnesses the flow of the Porce River to generate electricity for the national grid.
  • C. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • D. Roseires Hydropower Plant
    Roseires Hydropower Plant is a major hydroelectric facility in Sudan that generates electricity using water impounded by the Roseires Dam on the Blue Nile River.
  • E. Pantabangan Hydroelectric Power Plant
    Pantabangan Hydroelectric Power Plant is a major hydroelectric facility in the Philippines that generates power using water stored in the Pantabangan Dam reservoir.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Agus VI Hydroelectric Power Plant
Target entity description: Agus VI Hydroelectric Power Plant is a major hydroelectric facility in the Philippines that harnesses the flow of water from Maria Cristina Falls to generate electricity for the Mindanao region.
  • A. Tri An Hydropower Plant
    Tri An Hydropower Plant is a major hydroelectric power station in southern Vietnam that generates electricity from the Dong Nai River and supports regional power supply and water management.
  • B. Porce I Hydroelectric Power Plant
    Porce I Hydroelectric Power Plant is a major hydroelectric facility in Colombia that harnesses the flow of the Porce River to generate electricity for the national grid.
  • C. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • D. Roseires Hydropower Plant
    Roseires Hydropower Plant is a major hydroelectric facility in Sudan that generates electricity using water impounded by the Roseires Dam on the Blue Nile River.
  • E. Pantabangan Hydroelectric Power Plant
    Pantabangan Hydroelectric Power Plant is a major hydroelectric facility in the Philippines that generates power using water stored in the Pantabangan Dam reservoir.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38ea1e88190997e9b231190ba6f completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e550864b0481909e59fbcc79fda839 completed April 19, 2026, 10 p.m.
Created at: April 10, 2026, 11:47 a.m.