Triple

T18656893
Position Surface form Disambiguated ID Type / Status
Subject Maria Cristina Falls E456090 entity
Predicate instanceOf P0 FINISHED
Object hydroelectric power source C19469 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydroelectric power source
Context triple: [Maria Cristina Falls, instanceOf, hydroelectric power source]
  • A. run-of-the-river hydroelectric power plant
    A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
  • B. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • C. hydroelectric power complex chosen
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • D. hydro-wind power plant
    A hydro-wind power plant is a hybrid energy facility that combines hydropower and wind turbines to generate electricity more reliably and efficiently by leveraging complementary water and wind resources.
  • E. hydropower authority
    A hydropower authority is an organization responsible for planning, regulating, developing, and managing hydropower resources and facilities within a specific jurisdiction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38ea1e88190997e9b231190ba6f completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:47 a.m.