Triple

T1864901
Position Surface form Disambiguated ID Type / Status
Subject B7 E34896 entity
Predicate marksCareerPhase P6708 FINISHED
Object Brandy’s return to music after hiatus LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brandy’s return to music after hiatus | Statement: [B7, marksCareerPhase, Brandy’s return to music after hiatus]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: marksCareerPhase
Context triple: [B7, marksCareerPhase, Brandy’s return to music after hiatus]
  • A. partOfCareer
    Indicates that one entity represents a role, position, or period that forms a component or phase within another entity’s overall career.
  • B. isStageInCareerOf chosen
    Indicates that one entity represents a particular phase or stage within the professional career of another entity.
  • C. majorCapturePhase
    Indicates a significant or primary stage in a capture process where the main act of seizing, acquiring, or taking control occurs.
  • D. hasCareerTrack
    Indicates that an entity is associated with or follows a particular career path or professional progression.
  • E. launchedCareerOf
    Indicates that one entity’s actions, support, or involvement initiated or significantly advanced another entity’s professional career.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88600b2f88190bc09303e68ab517e completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69abb16c09e48190a345c95eab59fd87 completed March 7, 2026, 5:02 a.m.
PD Predicate disambiguation batch_69abafe02c3c819093a4744b476106ca completed March 7, 2026, 4:56 a.m.
Created at: March 4, 2026, 7:34 p.m.