Triple
T18644271
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Western Railway Headquarters Building |
E455763
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway administrative building |
C35926
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway administrative building Context triple: [Western Railway Headquarters Building, instanceOf, railway administrative building]
-
A.
railway office building
chosen
A railway office building is a facility that houses the administrative, operational, and support functions necessary for managing railway services, infrastructure, and personnel.
-
B.
railroad depot
A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
-
C.
former railway station
A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
-
D.
railway bridge terminus
A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
-
E.
former railway facility
A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38ea1e88190997e9b231190ba6f |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:47 a.m.