Triple

T18622715
Position Surface form Disambiguated ID Type / Status
Subject Crank–Nicolson method E455195 entity
Predicate instanceOf P0 FINISHED
Object finite difference method C37700 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: finite difference method
Context triple: [Crank–Nicolson method, instanceOf, finite difference method]
  • A. numerical integration method for ordinary differential equations
    A numerical integration method for ordinary differential equations is an algorithmic procedure that approximates the solution of an ODE over discrete steps by iteratively updating the dependent variable using information about its derivative.
  • B. time-stepping scheme
    A time-stepping scheme is a numerical method that advances the solution of time-dependent equations from one discrete time level to the next.
  • C. partial differential equation
    A partial differential equation is an equation that relates the partial derivatives of an unknown multivariable function, describing how it changes with respect to several independent variables.
  • D. discrete analogue of differential calculus chosen
    A discrete analogue of differential calculus is a mathematical framework that extends concepts like derivatives, integrals, and differential equations to functions defined on discrete domains, typically using difference operators and summation.
  • E. ode
    An ode is a lyrical poem, often formal and elevated in style, that expresses praise, admiration, or deep reflection on a particular subject.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38cc7948190a55ea64e5638994e completed April 10, 2026, 10:40 a.m.
Created at: April 10, 2026, 11:46 a.m.