Triple

T18619513
Position Surface form Disambiguated ID Type / Status
Subject COP15 Accord E455111 entity
Predicate adoptionMonth P3399 FINISHED
Object December LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: December | Statement: [COP15 Accord, adoptionMonth, December]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: adoptionMonth
Context triple: [COP15 Accord, adoptionMonth, December]
  • A. readoptedOn
    Indicates the date or time at which something that was previously adopted is formally adopted again.
  • B. adoptedAt
    Indicates the time or date at which an adoption event took place.
  • C. dateAdopted chosen
    Indicates the date on which something (such as a policy, standard, or item) was formally accepted or put into official use.
  • D. adoptedAfter
    Indicates that one entity was adopted at a later time than another entity.
  • E. officialAdoptionYear
    Indicates the year in which something (such as a policy, standard, symbol, or practice) was formally adopted or officially put into use.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38bbe7c8190bdec3138e7d413c9 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e54d07dc288190bb3b8b5ab06518da completed April 19, 2026, 9:45 p.m.
PD Predicate disambiguation batch_69e478d4a7948190a4bb9223bb5dddfc completed April 19, 2026, 6:40 a.m.
Created at: April 10, 2026, 11:46 a.m.