Triple

T18616045
Position Surface form Disambiguated ID Type / Status
Subject Bhakra Beas Management Board E455022 entity
Predicate responsibleFor P636 FINISHED
Object Bhakra Left Bank Power House NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bhakra Left Bank Power House | Statement: [Bhakra Beas Management Board, responsibleFor, Bhakra Left Bank Power House]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bhakra Left Bank Power House
Context triple: [Bhakra Beas Management Board, responsibleFor, Bhakra Left Bank Power House]
  • A. Bhakra Dam
    Bhakra Dam is a major concrete gravity dam in northern India, renowned for its role in irrigation, hydroelectric power generation, and flood control in the region.
  • B. Rana Pratap Sagar Power Station
    Rana Pratap Sagar Power Station is a hydroelectric power facility in Rajasthan, India, that generates electricity using water from the Rana Pratap Sagar Dam on the Chambal River.
  • C. Bhakra Nangal Project
    The Bhakra Nangal Project is a major multipurpose river valley development scheme in India centered on the Bhakra and Nangal dams, providing irrigation, hydroelectric power, and flood control to northern states.
  • D. Mangla Power Station
    Mangla Power Station is a major hydroelectric power generation facility located near the Mangla Dam in Pakistan, supplying significant electricity to the national grid.
  • E. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Bhakra Left Bank Power House
Target entity description: Bhakra Left Bank Power House is a major hydroelectric power station in India that generates electricity using water released from the Bhakra Dam on the Sutlej River.
  • A. Bhakra Dam
    Bhakra Dam is a major concrete gravity dam in northern India, renowned for its role in irrigation, hydroelectric power generation, and flood control in the region.
  • B. Rana Pratap Sagar Power Station
    Rana Pratap Sagar Power Station is a hydroelectric power facility in Rajasthan, India, that generates electricity using water from the Rana Pratap Sagar Dam on the Chambal River.
  • C. Bhakra Nangal Project
    The Bhakra Nangal Project is a major multipurpose river valley development scheme in India centered on the Bhakra and Nangal dams, providing irrigation, hydroelectric power, and flood control to northern states.
  • D. Mangla Power Station
    Mangla Power Station is a major hydroelectric power generation facility located near the Mangla Dam in Pakistan, supplying significant electricity to the national grid.
  • E. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38bbe7c8190bdec3138e7d413c9 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e54d05da9c8190b8f4ef3a7a6deb05 completed April 19, 2026, 9:45 p.m.
Created at: April 10, 2026, 11:46 a.m.