Triple
T18606352
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | DC Circulator (Anacostia route, historically) |
E454760
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | DC Circulator line |
C40961
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: DC Circulator line Context triple: [DC Circulator (Anacostia route, historically), instanceOf, DC Circulator line]
-
A.
Pink Line station
A Pink Line station is a designated stop or terminal along a transit system’s Pink Line where passengers can board, alight, and transfer between services.
-
B.
subway line
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
-
C.
Chicago 'L' service
Chicago 'L' service is the rapid transit system of Chicago, consisting of elevated, subway, and at-grade rail lines that provide frequent urban and suburban passenger transportation across the metropolitan area.
-
D.
former Los Angeles Metro Rail line
A former Los Angeles Metro Rail line is a previously operated light rail or rapid transit route within the Los Angeles Metro Rail system that has since been discontinued, restructured, or replaced.
-
E.
Purple Line station
A Purple Line station is a designated stop or terminal along a transit system's Purple Line where passengers can board, alight, and transfer between services.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d38bbe7c8190bdec3138e7d413c9 |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:45 a.m.