Triple

T18600057
Position Surface form Disambiguated ID Type / Status
Subject IFRS 9 Financial Instruments E454594 entity
Predicate mandatoryEffectiveDate P66767 FINISHED
Object 1 January 2018 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1 January 2018 | Statement: [IFRS 9 Financial Instruments, mandatoryEffectiveDate, 1 January 2018]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: mandatoryEffectiveDate
Context triple: [IFRS 9 Financial Instruments, mandatoryEffectiveDate, 1 January 2018]
  • A. decisionEffectiveDate chosen
    Indicates the date on which a particular decision becomes valid, operative, or officially takes effect.
  • B. lessEffectiveAt
    Indicates that one entity has a reduced ability or lower level of success in performing, influencing, or achieving a particular action or outcome compared to another.
  • C. effectivePeriodStart
    Indicates the date and time when a specified condition, status, or agreement becomes valid or goes into effect.
  • D. rulesEffectiveUpon
    Indicates that a set of rules becomes valid, applicable, or enforceable starting from a specified time, event, or condition.
  • E. effectiveFor
    Indicates that one entity successfully produces the intended effect, benefit, or desired outcome for another entity or condition.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38ae7e081908a98df1251842402 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5475018548190a2f497081af7ce55 completed April 19, 2026, 9:21 p.m.
PD Predicate disambiguation batch_69e478cf5e888190a0b1074b0c6525df completed April 19, 2026, 6:40 a.m.
Created at: April 10, 2026, 11:45 a.m.