Triple

T18583104
Position Surface form Disambiguated ID Type / Status
Subject Chena River Lakes Flood Control Project E454167 entity
Predicate floodControlMethod P25010 FINISHED
Object temporary water storage behind Moose Creek Dam LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: temporary water storage behind Moose Creek Dam | Statement: [Chena River Lakes Flood Control Project, floodControlMethod, temporary water storage behind Moose Creek Dam]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: floodControlMethod
Context triple: [Chena River Lakes Flood Control Project, floodControlMethod, temporary water storage behind Moose Creek Dam]
  • A. providesFloodControlFor
    Indicates that one entity offers protection or mitigation against flooding for another entity or area.
  • B. hasFloodControlStructure chosen
    Indicates that an entity possesses or is equipped with a structure designed to manage, control, or mitigate flooding.
  • C. flowControl
    Indicates a relationship where one entity regulates, directs, or manages the rate or sequence of another entity’s operations or movement.
  • D. congestionControlAlgorithm
    Indicates that one entity uses, implements, or is associated with a particular congestion control algorithm in managing network traffic.
  • E. hasFloodProtectionProject
    Indicates that a flood protection project exists or is implemented for the referenced entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38ae7e081908a98df1251842402 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e543d10b1c8190a401df810b7290c9 completed April 19, 2026, 9:06 p.m.
PD Predicate disambiguation batch_69e478c98d4c81909d37a0e72c6e7bd0 completed April 19, 2026, 6:40 a.m.
Created at: April 10, 2026, 11:44 a.m.