Triple
T1857418
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Croton Water Filtration Plant |
E41735
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water treatment plant |
C3665
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water treatment plant Context triple: [Croton Water Filtration Plant, instanceOf, water treatment plant]
-
A.
municipal water supply facility
A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
-
B.
water supply system
chosen
A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
-
C.
drinking water infrastructure
Drinking water infrastructure comprises the interconnected systems, facilities, and technologies used to source, treat, store, and distribute safe potable water to consumers.
-
D.
water purification device
A water purification device is a system or apparatus designed to remove contaminants and impurities from water to make it safe and suitable for specific uses such as drinking, cooking, or industrial processes.
-
E.
water source
A water source is any natural or artificial origin from which water is obtained for ecological, domestic, agricultural, or industrial use.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8864a83848190a4ec02721306c511 |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:33 p.m.