Triple
T18540832
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brooklyn, Flatbush and Coney Island line |
E453093
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | predecessor of New York City Subway line |
C40576
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: predecessor of New York City Subway line Context triple: [Brooklyn, Flatbush and Coney Island line, instanceOf, predecessor of New York City Subway line]
-
A.
former New York City Subway station
A former New York City Subway station is a decommissioned or abandoned stop that once served passengers on the NYC Subway system but is no longer in regular operation.
-
B.
predecessor of the Paris Métro
A predecessor of the Paris Métro is any earlier urban rail or transport system in Paris—such as horse-drawn trams, omnibuses, or suburban rail lines—that provided mass transit before the opening of the modern underground metro network.
-
C.
New York City Subway tunnel
A New York City Subway tunnel is an underground passageway engineered to safely guide subway trains, utilities, and related infrastructure beneath the city’s surface between stations.
-
D.
New York City Subway–railroad interchange
A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
-
E.
New York City Subway infrastructure project
A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d387b5548190aa030dad2cb4947e |
completed | April 10, 2026, 10:40 a.m. |
Created at: April 10, 2026, 11:37 a.m.