Triple
T18520773
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | USRA 0-6-0 switcher |
E452575
|
entity |
| Predicate | category |
P87
|
FINISHED |
| Object | USRA standard switcher |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: USRA standard switcher | Statement: [USRA 0-6-0 switcher, category, USRA standard switcher]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: USRA standard switcher Context triple: [USRA 0-6-0 switcher, category, USRA standard switcher]
-
A.
USRA
USRA is the commonly used acronym for the United States Railroad Administration, the U.S. government agency that temporarily nationalized and operated railroads during World War I.
-
B.
GP (General Purpose) road switchers
GP (General Purpose) road switchers are a widely used series of versatile diesel-electric locomotives designed for both road and switching service, produced by Electro-Motive Division and its successors.
-
C.
Omni-Path switch
An Omni-Path switch is a high-performance network device used to interconnect nodes in Omni-Path Architecture–based supercomputing and data center environments, providing low-latency, high-bandwidth communication.
-
D.
USBR
USBR is the United States Bureau of Reclamation, a federal agency responsible for managing water resources and operating dams, power plants, and irrigation projects in the American West.
-
E.
5ESS switch
The 5ESS switch is a digital telecommunications switching system widely deployed by telephone companies to route voice and data traffic in public switched telephone networks.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: USRA standard switcher Target entity description: The USRA standard switcher was a class of steam-powered yard locomotives designed under the United States Railroad Administration for efficient switching and short-haul duties across multiple American railroads.
-
A.
USRA
chosen
USRA is the commonly used acronym for the United States Railroad Administration, the U.S. government agency that temporarily nationalized and operated railroads during World War I.
-
B.
GP (General Purpose) road switchers
GP (General Purpose) road switchers are a widely used series of versatile diesel-electric locomotives designed for both road and switching service, produced by Electro-Motive Division and its successors.
-
C.
Omni-Path switch
An Omni-Path switch is a high-performance network device used to interconnect nodes in Omni-Path Architecture–based supercomputing and data center environments, providing low-latency, high-bandwidth communication.
-
D.
USBR
USBR is the United States Bureau of Reclamation, a federal agency responsible for managing water resources and operating dams, power plants, and irrigation projects in the American West.
-
E.
5ESS switch
The 5ESS switch is a digital telecommunications switching system widely deployed by telephone companies to route voice and data traffic in public switched telephone networks.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d386df84819092355ebb260d848e |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e5338db5e4819086503a2176dfe499 |
completed | April 19, 2026, 7:57 p.m. |
Created at: April 10, 2026, 11:37 a.m.