Triple

T18517144
Position Surface form Disambiguated ID Type / Status
Subject Jerry Linenger E452494 entity
Predicate spaceMission P68 FINISHED
Object Mir EO-22 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mir EO-22 | Statement: [Jerry Linenger, spaceMission, Mir EO-22]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mir EO-22
Context triple: [Jerry Linenger, spaceMission, Mir EO-22]
  • A. Mir EO-22 chosen
    Mir EO-22 was a long-duration crewed expedition to the Russian Mir space station, continuing its scientific research and operations in low Earth orbit.
  • B. Mir EO-20
    Mir EO-20 was a long-duration crewed expedition to the Russian Mir space station that took place just before the Mir EO-21 mission.
  • C. Mir EO-21
    Mir EO-21 was a long-duration 1996 expedition to the Russian Mir space station that included NASA astronaut Shannon Lucid as a research cosmonaut.
  • D. Mir EO-23
    Mir EO-23 was a long-duration expedition to the Russian Mir space station in the late 1990s that included NASA astronaut Michael Foale as part of the crew.
  • E. Mireo
    Mireo is a family of modern regional and commuter trains developed by Siemens Mobility, known for their energy efficiency, modular design, and suitability for short- to medium-distance rail services.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d386df84819092355ebb260d848e completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e5338b2cd0819095db59f6bfc70814 completed April 19, 2026, 7:56 p.m.
Created at: April 10, 2026, 11:36 a.m.