Triple
T18517142
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jerry Linenger |
E452494
|
entity |
| Predicate | spaceMission |
P68
|
FINISHED |
| Object | STS-81 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-81 | Statement: [Jerry Linenger, spaceMission, STS-81]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-81 Context triple: [Jerry Linenger, spaceMission, STS-81]
-
A.
STS-81
chosen
STS-81 was a NASA Space Shuttle Atlantis mission to the Russian Mir space station in January 1997, focused on crew exchange, resupply, and scientific research.
-
B.
STS-83
STS-83 was a 1997 NASA Space Shuttle Columbia mission focused on microgravity science research as part of the Microgravity Science Laboratory program.
-
C.
STS-86
STS-86 was a 1997 NASA Space Shuttle mission that conducted a docking with the Russian Mir space station as part of the Shuttle–Mir program.
-
D.
STS-80
STS-80 was a 1996 Space Shuttle Columbia mission focused on deploying and retrieving scientific satellites and conducting microgravity research in Earth orbit.
-
E.
STS-89
STS-89 was a NASA Space Shuttle mission to the Russian Mir space station that conducted crew transfer and scientific research as part of the Shuttle–Mir program.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d386df84819092355ebb260d848e |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e5338b2cd0819095db59f6bfc70814 |
completed | April 19, 2026, 7:56 p.m. |
Created at: April 10, 2026, 11:36 a.m.