Triple
T1847352
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rockaway route |
E41313
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | New York City Ferry route |
C4626
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: New York City Ferry route Context triple: [Rockaway route, instanceOf, New York City Ferry route]
-
A.
bridge in New York City
A bridge in New York City is a large-scale transportation structure spanning waterways or land to connect boroughs and neighborhoods, supporting vehicular, rail, bicycle, and pedestrian traffic within the city’s dense urban environment.
-
B.
New York City Subway–railroad interchange
A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
-
C.
ferry service
chosen
A ferry service is a transportation operation that regularly carries passengers, vehicles, and sometimes cargo across bodies of water along fixed routes and schedules.
-
D.
Long Island Rail Road service area
The Long Island Rail Road service area encompasses the network of commuter rail lines and stations extending from New York City through Nassau and Suffolk counties on Long Island, providing passenger rail service to communities across this region.
-
E.
New York City community board
A New York City community board is a local advisory group of appointed residents that consults on land use, budget, and service delivery issues within a specific community district.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88648cd44819093303206d96d76ad |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:33 p.m.