Triple

T18448643
Position Surface form Disambiguated ID Type / Status
Subject Nam Ngum 1 Dam E450720 entity
Predicate operator P179 FINISHED
Object Électricité du Laos NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Électricité du Laos | Statement: [Nam Ngum 1 Dam, operator, Électricité du Laos]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Électricité du Laos
Context triple: [Nam Ngum 1 Dam, operator, Électricité du Laos]
  • A. Laos national power grid
    The Laos national power grid is the countrywide electrical transmission and distribution network that delivers hydroelectric and other generated power to consumers across Laos and for export to neighboring countries.
  • B. National Power Corporation
    The National Power Corporation is a Philippine government-owned corporation responsible for power generation and electrification, particularly in missionary and off-grid areas.
  • C. Lao Ministry of Energy and Mines
    The Lao Ministry of Energy and Mines is the government body responsible for formulating and implementing national policies on energy development, electricity generation, and mineral resource management in Laos.
  • D. Nam Ngum 5 Hydropower Project
    The Nam Ngum 5 Hydropower Project is a hydroelectric power development in Laos that harnesses the Nam Ngum River to generate electricity for the country’s energy grid and regional power exports.
  • E. Nam Ngum 1 Hydropower Project
    The Nam Ngum 1 Hydropower Project is a major hydroelectric dam and power station in Laos that plays a key role in the country’s electricity generation and regional power exports.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Électricité du Laos
Target entity description: Électricité du Laos is the state-owned electric power company of Laos, responsible for electricity generation, transmission, and distribution across the country and for power exports to neighboring nations.
  • A. Laos national power grid
    The Laos national power grid is the countrywide electrical transmission and distribution network that delivers hydroelectric and other generated power to consumers across Laos and for export to neighboring countries.
  • B. National Power Corporation
    The National Power Corporation is a Philippine government-owned corporation responsible for power generation and electrification, particularly in missionary and off-grid areas.
  • C. Lao Ministry of Energy and Mines
    The Lao Ministry of Energy and Mines is the government body responsible for formulating and implementing national policies on energy development, electricity generation, and mineral resource management in Laos.
  • D. Nam Ngum 5 Hydropower Project
    The Nam Ngum 5 Hydropower Project is a hydroelectric power development in Laos that harnesses the Nam Ngum River to generate electricity for the country’s energy grid and regional power exports.
  • E. Nam Ngum 1 Hydropower Project
    The Nam Ngum 1 Hydropower Project is a major hydroelectric dam and power station in Laos that plays a key role in the country’s electricity generation and regional power exports.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8d38345688190b565eac2e4cd7935 completed April 10, 2026, 10:40 a.m.
NER Named-entity recognition batch_69e52646949c81909664e864224675a6 completed April 19, 2026, 7 p.m.
Created at: April 10, 2026, 11:30 a.m.