Triple
T18441773
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Falls Lake Dam |
E450545
|
entity |
| Predicate | partOfProject |
P10
|
FINISHED |
| Object | Falls Lake Project |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Falls Lake Project | Statement: [Falls Lake Dam, partOfProject, Falls Lake Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Falls Lake Project Context triple: [Falls Lake Dam, partOfProject, Falls Lake Project]
-
A.
Falls Lake Dam
Falls Lake Dam is a major earthen dam in North Carolina that impounds the Neuse River to create Falls Lake for flood control, water supply, and recreation.
-
B.
Nolin River Lake project
The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
-
C.
Yadkin Project
The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
-
D.
Tellico Dam project
The Tellico Dam project was a controversial Tennessee Valley Authority initiative on the Little Tennessee River, widely known for its environmental and cultural impacts, including the flooding of historic Cherokee sites and a landmark legal battle over the endangered snail darter.
-
E.
Warm Springs Dam
Warm Springs Dam is a major irrigation and flood-control structure located on the Malheur River in eastern Oregon, United States.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Falls Lake Project Target entity description: Falls Lake Project is a U.S. Army Corps of Engineers water resources initiative in North Carolina focused on flood control, water supply, recreation, and environmental management centered around Falls Lake and its dam.
-
A.
Falls Lake Dam
chosen
Falls Lake Dam is a major earthen dam in North Carolina that impounds the Neuse River to create Falls Lake for flood control, water supply, and recreation.
-
B.
Nolin River Lake project
The Nolin River Lake project is a U.S. Army Corps of Engineers flood-control and recreation initiative centered on Nolin River Lake in central Kentucky.
-
C.
Yadkin Project
The Yadkin Project is a hydroelectric power and reservoir system on the Yadkin River in North Carolina, managed for electricity generation, recreation, and water resource management.
-
D.
Tellico Dam project
The Tellico Dam project was a controversial Tennessee Valley Authority initiative on the Little Tennessee River, widely known for its environmental and cultural impacts, including the flooding of historic Cherokee sites and a landmark legal battle over the endangered snail darter.
-
E.
Warm Springs Dam
Warm Springs Dam is a major irrigation and flood-control structure located on the Malheur River in eastern Oregon, United States.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d381d6388190a9e94e9c658174e4 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e51c11b1288190b9ed4497751197d1 |
completed | April 19, 2026, 6:16 p.m. |
Created at: April 10, 2026, 11:30 a.m.