Triple
T18439092
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shellmouth Dam |
E450476
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object |
Assiniboine River flood control system
The Assiniboine River flood control system is an integrated network of dams, reservoirs, and related infrastructure designed to manage water levels and reduce flooding along the Assiniboine River in Canada.
|
E1324176
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Assiniboine River flood control system | Statement: [Shellmouth Dam, partOf, Assiniboine River flood control system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Assiniboine River flood control system Context triple: [Shellmouth Dam, partOf, Assiniboine River flood control system]
-
A.
Chena River Lakes Flood Control Project
The Chena River Lakes Flood Control Project is a U.S. Army Corps of Engineers system of dams, levees, and related structures near Fairbanks, Alaska, designed to reduce flooding along the Chena River and protect surrounding communities.
-
B.
Red River flood control system
The Red River flood control system is an integrated network of dams, reservoirs, and related infrastructure designed to manage water flow, reduce flooding, and support water supply and recreation along the Red River.
-
C.
Missouri River reservoir system
The Missouri River reservoir system is a network of large dams and reservoirs along the Missouri River designed primarily for flood control, hydroelectric power generation, irrigation, navigation, and recreation.
-
D.
Tioga-Hammond Lakes flood control system
The Tioga-Hammond Lakes flood control system is a U.S. Army Corps of Engineers project in north-central Pennsylvania that uses two interconnected reservoirs and dams to reduce flooding, provide recreation, and support water management along the Tioga River and surrounding region.
-
E.
Trinity River floodway
The Trinity River floodway is a large engineered flood-control channel and greenbelt in Dallas, Texas, designed to manage Trinity River flooding while providing open space and transportation corridors.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Assiniboine River flood control system Triple: [Shellmouth Dam, partOf, Assiniboine River flood control system]
Generated description
The Assiniboine River flood control system is an integrated network of dams, reservoirs, and related infrastructure designed to manage water levels and reduce flooding along the Assiniboine River in Canada.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Assiniboine River flood control system Target entity description: The Assiniboine River flood control system is an integrated network of dams, reservoirs, and related infrastructure designed to manage water levels and reduce flooding along the Assiniboine River in Canada.
-
A.
Chena River Lakes Flood Control Project
The Chena River Lakes Flood Control Project is a U.S. Army Corps of Engineers system of dams, levees, and related structures near Fairbanks, Alaska, designed to reduce flooding along the Chena River and protect surrounding communities.
-
B.
Red River flood control system
The Red River flood control system is an integrated network of dams, reservoirs, and related infrastructure designed to manage water flow, reduce flooding, and support water supply and recreation along the Red River.
-
C.
Missouri River reservoir system
The Missouri River reservoir system is a network of large dams and reservoirs along the Missouri River designed primarily for flood control, hydroelectric power generation, irrigation, navigation, and recreation.
-
D.
Tioga-Hammond Lakes flood control system
The Tioga-Hammond Lakes flood control system is a U.S. Army Corps of Engineers project in north-central Pennsylvania that uses two interconnected reservoirs and dams to reduce flooding, provide recreation, and support water management along the Tioga River and surrounding region.
-
E.
Trinity River floodway
The Trinity River floodway is a large engineered flood-control channel and greenbelt in Dallas, Texas, designed to manage Trinity River flooding while providing open space and transportation corridors.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d381d6388190a9e94e9c658174e4 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e51c0ed6708190ae90efd8455ec352 |
completed | April 19, 2026, 6:16 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a03f0b54224819084e67182674cfb83 |
completed | May 13, 2026, 3:32 a.m. |
| NEDg | Description generation | batch_6a03f2b7da408190b58c82fd5422a3c0 |
completed | May 13, 2026, 3:40 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a03f32845348190963abbf6a039d2c6 |
completed | May 13, 2026, 3:42 a.m. |
Created at: April 10, 2026, 11:30 a.m.