Triple
T18429191
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Homathko Estuary Provincial Park |
E450217
|
entity |
| Predicate | protects |
P1040
|
FINISHED |
| Object | Homathko River estuary |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Homathko River estuary | Statement: [Homathko Estuary Provincial Park, protects, Homathko River estuary]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Homathko River estuary Context triple: [Homathko Estuary Provincial Park, protects, Homathko River estuary]
-
A.
Potengi River estuary
The Potengi River estuary is a coastal waterway in northeastern Brazil that forms the natural harbor and waterfront setting of the city of Natal in Rio Grande do Norte.
-
B.
Pamet River estuary
The Pamet River estuary is a coastal wetland area in Truro, Massachusetts, where the Pamet River meets the Atlantic Ocean, characterized by tidal marshes, dunes, and rich bird and marine life.
-
C.
Moruya River estuary
The Moruya River estuary is a coastal waterway on the south coast of New South Wales, Australia, where the Moruya River meets the Tasman Sea, supporting rich aquatic habitats and recreational activities.
-
D.
Imjin River estuary
The Imjin River estuary is a strategically significant tidal river mouth in Korea that forms part of the boundary between North and South Korea and flows into the Yellow Sea.
-
E.
Mooriganga River estuary
The Mooriganga River estuary is a coastal river mouth in West Bengal, India, forming part of the tidal waterways and mangrove-fringed landscape of the lower Ganges delta near the Bay of Bengal.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Homathko River estuary Target entity description: The Homathko River estuary is a remote coastal river mouth ecosystem in British Columbia, Canada, characterized by tidal flats, wetlands, and rich wildlife habitat where the Homathko River meets the Pacific Ocean.
-
A.
Potengi River estuary
The Potengi River estuary is a coastal waterway in northeastern Brazil that forms the natural harbor and waterfront setting of the city of Natal in Rio Grande do Norte.
-
B.
Pamet River estuary
The Pamet River estuary is a coastal wetland area in Truro, Massachusetts, where the Pamet River meets the Atlantic Ocean, characterized by tidal marshes, dunes, and rich bird and marine life.
-
C.
Moruya River estuary
The Moruya River estuary is a coastal waterway on the south coast of New South Wales, Australia, where the Moruya River meets the Tasman Sea, supporting rich aquatic habitats and recreational activities.
-
D.
Imjin River estuary
The Imjin River estuary is a strategically significant tidal river mouth in Korea that forms part of the boundary between North and South Korea and flows into the Yellow Sea.
-
E.
Mooriganga River estuary
The Mooriganga River estuary is a coastal river mouth in West Bengal, India, forming part of the tidal waterways and mangrove-fringed landscape of the lower Ganges delta near the Bay of Bengal.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8d381d6388190a9e94e9c658174e4 |
completed | April 10, 2026, 10:40 a.m. |
| NER | Named-entity recognition | batch_69e51b15e2e081908c96c5678ff4b941 |
completed | April 19, 2026, 6:12 p.m. |
Created at: April 10, 2026, 11:25 a.m.