Triple

T18400613
Position Surface form Disambiguated ID Type / Status
Subject Santiago urban highway network E449982 entity
Predicate hasComponent P35 FINISHED
Object Autopista Acceso Sur a Santiago NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Autopista Acceso Sur a Santiago | Statement: [Santiago urban highway network, hasComponent, Autopista Acceso Sur a Santiago]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Autopista Acceso Sur a Santiago
Context triple: [Santiago urban highway network, hasComponent, Autopista Acceso Sur a Santiago]
  • A. Chile Route 7
    Chile Route 7, also known as the Carretera Austral, is a remote and scenic highway in southern Chile that winds through Patagonia’s fjords, forests, and national parks.
  • B. Autopista Sur
    Autopista Sur is a major highway corridor in the Bogotá metropolitan area that serves as a primary route connecting the capital with the municipality of Soacha and the broader southwest region of Colombia.
  • C. Chile Route 27
    Chile Route 27 is a high-altitude highway in northern Chile that connects the city of San Pedro de Atacama to the Jama Pass on the border with Argentina, crossing the Andes through the Atacama Desert.
  • D. Costanera Norte highway
    The Costanera Norte highway is a major urban expressway in Santiago, Chile, forming a key east–west traffic corridor through the city.
  • E. Rodovia Anchieta
    Rodovia Anchieta is a major Brazilian highway that connects the city of São Paulo to the coastal region of Baixada Santista, serving as a key route to beaches and port areas.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Autopista Acceso Sur a Santiago
Target entity description: Autopista Acceso Sur a Santiago is a major toll expressway that provides southern vehicular access into the city of Santiago, Chile, helping to connect outlying areas with the capital’s urban core.
  • A. Chile Route 7
    Chile Route 7, also known as the Carretera Austral, is a remote and scenic highway in southern Chile that winds through Patagonia’s fjords, forests, and national parks.
  • B. Autopista Sur
    Autopista Sur is a major highway corridor in the Bogotá metropolitan area that serves as a primary route connecting the capital with the municipality of Soacha and the broader southwest region of Colombia.
  • C. Chile Route 27
    Chile Route 27 is a high-altitude highway in northern Chile that connects the city of San Pedro de Atacama to the Jama Pass on the border with Argentina, crossing the Andes through the Atacama Desert.
  • D. Costanera Norte highway
    The Costanera Norte highway is a major urban expressway in Santiago, Chile, forming a key east–west traffic corridor through the city.
  • E. Rodovia Anchieta
    Rodovia Anchieta is a major Brazilian highway that connects the city of São Paulo to the coastal region of Baixada Santista, serving as a key route to beaches and port areas.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9fab8a8819086a9ddc0871715e0 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e5194f2a8c8190afcd7db23e3795fb completed April 19, 2026, 6:05 p.m.
Created at: April 10, 2026, 10:46 a.m.