Triple

T18400609
Position Surface form Disambiguated ID Type / Status
Subject Santiago urban highway network E449982 entity
Predicate hasComponent P35 FINISHED
Object Ruta 5 urban section NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ruta 5 urban section | Statement: [Santiago urban highway network, hasComponent, Ruta 5 urban section]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ruta 5 urban section
Context triple: [Santiago urban highway network, hasComponent, Ruta 5 urban section]
  • A. Ruta 5
    Ruta 5 is a national roadway in Costa Rica that serves as a key connector within the country's highway network.
  • B. Ruta 5 chosen
    Ruta 5 is Chile’s main longitudinal highway, running the length of the country as the core section of the Pan-American Highway within Chile.
  • C. R-5 motorway
    The R-5 motorway is a radial toll highway in the Madrid region of Spain that connects the capital with the southwestern suburbs and beyond.
  • D. R-4 motorway
    The R-4 motorway is a Spanish radial toll highway that provides an alternative route to the A-4 between Madrid and southern cities such as Valdemoro and Ocaña.
  • E. Tricity ring road
    The Tricity ring road is a major bypass highway encircling Poland’s Tricity metropolitan area (Gdańsk, Gdynia, and Sopot), designed to divert transit traffic away from city centers and improve regional connectivity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9fab8a8819086a9ddc0871715e0 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e5194f2a8c8190afcd7db23e3795fb completed April 19, 2026, 6:05 p.m.
Created at: April 10, 2026, 10:46 a.m.