Triple

T18396335
Position Surface form Disambiguated ID Type / Status
Subject North American XB-70 Valkyrie E449880 entity
Predicate instanceOf P0 FINISHED
Object experimental strategic bomber prototype C22947 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: experimental strategic bomber prototype
Context triple: [North American XB-70 Valkyrie, instanceOf, experimental strategic bomber prototype]
  • A. prototype bomber aircraft chosen
    A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
  • B. experimental aircraft
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • C. nuclear-powered aircraft prototype
    A nuclear-powered aircraft prototype is an experimental aircraft design that uses a nuclear reactor as its primary energy source to generate thrust or power propulsion systems, aiming for extremely long endurance without refueling.
  • D. strategic bomber
    A strategic bomber is a long-range military aircraft designed to deliver large payloads of bombs or missiles against distant, high-value strategic targets such as infrastructure, industry, and command centers.
  • E. unbuilt aircraft project
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9fab8a8819086a9ddc0871715e0 completed April 10, 2026, 8:51 a.m.
Created at: April 10, 2026, 10:46 a.m.