Triple

T18392691
Position Surface form Disambiguated ID Type / Status
Subject Upper Svir Hydroelectric Station E449776 entity
Predicate partOf P40 FINISHED
Object Svir Hydroelectric Cascade NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Svir Hydroelectric Cascade | Statement: [Upper Svir Hydroelectric Station, partOf, Svir Hydroelectric Cascade]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Svir Hydroelectric Cascade
Context triple: [Upper Svir Hydroelectric Station, partOf, Svir Hydroelectric Cascade]
  • A. Rjukan Hydroelectric Power Station
    Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
  • B. Mainskaya Hydroelectric Power Station
    Mainskaya Hydroelectric Power Station is a Russian hydroelectric facility that operates as part of the Sayano–Shushenskaya Dam complex on the Yenisei River.
  • C. Evenk Hydroelectric Power Station
    The Evenk Hydroelectric Power Station is a proposed large-scale hydroelectric dam project in Russia’s Krasnoyarsk Krai, planned to harness the energy potential of the Lower Tunguska River in Siberia.
  • D. Zeya Hydroelectric Power Station
    The Zeya Hydroelectric Power Station is a major Soviet-era hydroelectric dam and power plant in Russia’s Amur Oblast, serving as a key source of electricity and flood control in the Russian Far East.
  • E. Uglich Hydroelectric Station
    Uglich Hydroelectric Station is a hydroelectric power plant on the Volga River in Russia, forming part of the Volga–Kama cascade and providing electricity generation and water regulation for the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Svir Hydroelectric Cascade
Target entity description: Svir Hydroelectric Cascade is a system of hydroelectric power plants on the Svir River in Russia that collectively generate electricity and regulate water flow between Lakes Onega and Ladoga.
  • A. Rjukan Hydroelectric Power Station
    Rjukan Hydroelectric Power Station is a historic Norwegian hydroelectric facility central to early 20th-century industrial development and recognized as part of a UNESCO World Heritage industrial landscape.
  • B. Mainskaya Hydroelectric Power Station
    Mainskaya Hydroelectric Power Station is a Russian hydroelectric facility that operates as part of the Sayano–Shushenskaya Dam complex on the Yenisei River.
  • C. Evenk Hydroelectric Power Station
    The Evenk Hydroelectric Power Station is a proposed large-scale hydroelectric dam project in Russia’s Krasnoyarsk Krai, planned to harness the energy potential of the Lower Tunguska River in Siberia.
  • D. Zeya Hydroelectric Power Station
    The Zeya Hydroelectric Power Station is a major Soviet-era hydroelectric dam and power plant in Russia’s Amur Oblast, serving as a key source of electricity and flood control in the Russian Far East.
  • E. Uglich Hydroelectric Station
    Uglich Hydroelectric Station is a hydroelectric power plant on the Volga River in Russia, forming part of the Volga–Kama cascade and providing electricity generation and water regulation for the region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9fab8a8819086a9ddc0871715e0 completed April 10, 2026, 8:51 a.m.
NER Named-entity recognition batch_69e518435cf481908393c1eb2b4ba659 completed April 19, 2026, 6 p.m.
Created at: April 10, 2026, 10:46 a.m.