Triple

T18375467
Position Surface form Disambiguated ID Type / Status
Subject Town lattice truss E446302 entity
Predicate instanceOf P0 FINISHED
Object patented structural system C40427 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: patented structural system
Context triple: [Town lattice truss, instanceOf, patented structural system]
  • A. seismic-resistant structural system
    A seismic-resistant structural system is an engineered arrangement of structural elements and connections designed to safely withstand and dissipate earthquake-induced forces, minimizing damage and preventing collapse.
  • B. modular load-carrying system
    A modular load-carrying system is a configurable assembly of interchangeable components designed to transport, support, and adapt to varying types and amounts of loads in different operational contexts.
  • C. reinforced concrete structure
    A reinforced concrete structure is a construction system in which concrete is combined with embedded steel reinforcement to resist both compressive and tensile forces, providing strength, durability, and stability for buildings and infrastructure.
  • D. portable bridge system
    A portable bridge system is a modular, transportable structure designed to be rapidly deployed and assembled to provide temporary or emergency crossing over obstacles such as rivers, gaps, or damaged infrastructure.
  • E. brick structure
    A brick structure is a constructed form made primarily from individual clay or concrete bricks bonded together, typically with mortar, to create durable walls, buildings, or other architectural elements.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9f370b88190b1e5081c2c238e7f completed April 10, 2026, 8:50 a.m.
Created at: April 10, 2026, 10:45 a.m.