Triple

T18367060
Position Surface form Disambiguated ID Type / Status
Subject Surf Line E440074 entity
Predicate partOf P40 FINISHED
Object LOSSAN Corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: LOSSAN Corridor | Statement: [Surf Line, partOf, LOSSAN Corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: LOSSAN Corridor
Context triple: [Surf Line, partOf, LOSSAN Corridor]
  • A. San Jose Boulevard corridor
    The San Jose Boulevard corridor is a major commercial strip in Mandarin, Florida, lined with shopping centers, restaurants, and various local businesses.
  • B. Torres Maldonado Corridor
    Torres Maldonado Corridor is an architectural project by Preston Scott Cohen known for its complex geometric design and innovative spatial organization.
  • C. Banfield Freeway corridor
    The Banfield Freeway corridor is a major transportation route in Portland, Oregon, carrying Interstate 84 and associated rail and transit lines through the city’s east side.
  • D. Paradise Drive corridor
    The Paradise Drive corridor is a scenic roadway and surrounding area along the shoreline of the Tiburon Peninsula in Marin County, California, known for its waterfront views, residential neighborhoods, and recreational access.
  • E. Highway 91 corridor
    The Highway 91 corridor is a major regional transportation route in Metro Vancouver, British Columbia, carrying high volumes of commuter and commercial traffic between key urban centers and connecting bridges.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: LOSSAN Corridor
Target entity description: The LOSSAN Corridor is a major passenger rail route along the Southern California coast, connecting key cities such as San Diego, Los Angeles, and San Luis Obispo.
  • A. San Jose Boulevard corridor
    The San Jose Boulevard corridor is a major commercial strip in Mandarin, Florida, lined with shopping centers, restaurants, and various local businesses.
  • B. Torres Maldonado Corridor
    Torres Maldonado Corridor is an architectural project by Preston Scott Cohen known for its complex geometric design and innovative spatial organization.
  • C. Banfield Freeway corridor
    The Banfield Freeway corridor is a major transportation route in Portland, Oregon, carrying Interstate 84 and associated rail and transit lines through the city’s east side.
  • D. Paradise Drive corridor
    The Paradise Drive corridor is a scenic roadway and surrounding area along the shoreline of the Tiburon Peninsula in Marin County, California, known for its waterfront views, residential neighborhoods, and recreational access.
  • E. Highway 91 corridor
    The Highway 91 corridor is a major regional transportation route in Metro Vancouver, British Columbia, carrying high volumes of commuter and commercial traffic between key urban centers and connecting bridges.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b918221c8190a9f7b563d64ac677 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e5174f5f448190a1fc67d3039aadd9 completed April 19, 2026, 5:56 p.m.
Created at: April 10, 2026, 10:38 a.m.