Triple

T18359188
Position Surface form Disambiguated ID Type / Status
Subject On the Third Day E439870 entity
Predicate follows P134 FINISHED
Object ELO 2 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ELO 2 | Statement: [On the Third Day, follows, ELO 2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: ELO 2
Context triple: [On the Third Day, follows, ELO 2]
  • A. ELO Live
    ELO Live is a live album capturing Electric Light Orchestra’s concert performances, showcasing their symphonic rock sound in a live setting.
  • B. ELO chosen
    ELO (Electric Light Orchestra) is a British rock band known for blending pop and rock with classical-inspired orchestration and elaborate studio production.
  • C. ELO
    ELO is a regional Protestant church body in Germany that is part of the Evangelical Lutheran tradition.
  • D. E.L.E. 2: The Wrath of God
    E.L.E. 2: The Wrath of God is a studio album by American rapper Busta Rhymes that serves as a sequel to his 1998 project "E.L.E. (Extinction Level Event): The Final World Front."
  • E. ELDO
    ELDO was an intergovernmental European organization established in the 1960s to develop and coordinate a joint European satellite launch vehicle program.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b918221c8190a9f7b563d64ac677 completed April 10, 2026, 8:47 a.m.
NER Named-entity recognition batch_69e516d9dba8819088c5d772e3ee670d completed April 19, 2026, 5:54 p.m.
Created at: April 10, 2026, 10:37 a.m.